You have just completed an update to the BMC for a new Intel Server System based on Intel Xeon E52600 v3. How would you best advise your customer in order to ensure that the server is ready for storage configuration, power monitoring and customer use? (Select ALL that apply).
A. The FRU/SDR, ME and BIOS should then all be updated to ensure correct operation following a BMC update.
B. The PSU must be updated following a system reboot after the BMC update followed by the HSC, FRUSDR, ME and BIOS.
C. The PSU must be updated followed immediately by the HSC, and then a system reboot.
D. The HSC must be updated immediately by the PSU and no system reboot.
E. The BMC update includes the HSC and PSU firmware.
F. The HSC must be updated separately in the correct sequence (with no system reboot) followed by thePSU, FRUSDR, ME andBIOS.