Questions 4

Which three options represent capabilities of the broadcast feature within Collaboration initiated via OFSC Mobility?

A. broadcast messages to users based on their assigned Collaboration group(s)

B. broadcast messages to users based on their proximity to a location on the map

C. broadcast messages to users based on their compliance with Smart Location settings

D. broadcast messages to users based on their matches to an activity's work zone, work skill, and timing requirements

E. broadcast messages to users based on their assigned Help Desk(s)

F. broadcast messages to users based on their assigned User Type

Browse 132 Q&As
Questions 5

A company needs their field workers to be able to install inventory once an activity is in 'Started' status. Which screen configuration option supports this requirement?

A. Enable the 'Install' action within the Start Activity context.

B. Enable the 'Install' action within the Edit/View Activity context.

C. Enable the 'Install' action within the Add/Details Inventory context.

D. Enable the 'Install' action within the Inventory Grid context.

Browse 132 Q&As
Questions 6

Yourcustomer wants to configure an inner step message ("B") to send an email if a previous message ("A ) has Failed.

Which statement explains how this can be supported?

A. In the Message Scenario screen's Blocking Conditions tab of message B, add a condition that blocks the message when the message A's status is NOT IN failed.

B. In the Message Scenario screen's Next Steps tab of message A, add message B as the Next Message Step with the final status "Failed".

C. In the Message Scenario screen's Next Stepstab of message B, add message A as the Next Message Step with the final status Failed".

D. In the Message Scenario screen's Blocking Conditions tab of message B, add a condition that blocks the message when the message A's status is NOT IN sent.

Browse 132 Q&As
Questions 7

Your customer requires that their engineers make courtesy calls 2-4 hours after they complete an installation to make sure that everything is working properly.

Two activities are created via integration but they need to be linked.

Identify the correct setupfor the link template.

A. Set up a Start-to-Start template with a non-adjustable 2-hour Minimum interval and an adjustable 4hour Maximum interval.

B. Set up a Finish-to-Start template with a non-adjustable 2-hour Minimum interval and an adjustable 4hour Maximum interval.

C. Set up a Start-to-Start template with an adjustable 2-hour Minimum interval and an adjustable 4-hour Maximum interval.

D. Set up a Finish-to-Start template with an adjustable 2-hour Minimum interval and an adjustable 4-hour Maximum interval.

Browse 132 Q&As
Questions 8

A customer has technicians with varying degrees of training to perform installation work.

Their current corresponding skill levels are:

Expert level value = 100

Fully Qualified level value = 50

Novice level value = 25

For activities that require expert technicians, there is already an "Installation" work skill in place to identify those high visibility activities and enforce that assignment rule.

However, another segment of mid-tier installation activities must be assigned to technicians that are at least novices, but even better if they are considered fully qualified.

Which configuration satisfies the requirement of assigning thosemid-tier installation activities?

A. Create a Mid-Tier Installation work skill where its condition has a Required level of 25 and a Preferable level of 50

B. Modify the existing Installation work skill's conditions, setting the Required level to 25, thePreferable level to 50 and creating an additional condition to identify high visibility activities

C. Modify the existing Installation work skill's conditions, setting the Required level to 50, the Preferable level to 25 and creating an additional condition to identify high visibility activities

D. Create a Mid-Tier Installation work skill where its condition has a Required level of 50 and a Preferable level of 25.

Browse 132 Q&As
Questions 9

What happens when you enable the assignment parameter "Limit work by points"?

A. If resources have shifts assigned to them with point values, routing will not assign activities whose cumulative point total exceeds the shift point value.

B. Routing will use each activity's unique point value to prioritize assignment of higher point activities over lower point activities.

C. Routing will not assign a given activity if that activity's point value exceeds the resource's maximum personal point limit.

D. If a resource has a point value configured on their Resource Information screen, routing will limit assignment of additional activities if the cumulative point total exceeds the resource's point limit

Browse 132 Q&As
Questions 10

Which two statements are correct regarding the characteristics of an SLA window?

A. An SLA window indicates when an activity should be completed.

B. An SLA window indicates how long an activity should take to complete.

C. An SLA window indicates that there is enough time available within it to perform an activity.

D. An SLA window indicates when an activity should start.

Browse 132 Q&As
Questions 11

Youwant to copy Thursday's Time Slot-Based quota to Friday.

On the Quota by Time Slot view, what is a valid way of setting the quota grid so Friday's Quota is 85% of Thursday's Quota?

A. Select Friday using the calendar. Click "Mass populate" and select thenext day value = previous day value * percent operation with an 85% value.

B. Select Friday using the calendar. Click "Mass populate" and select the next day value = previous day value * percent operation and select Thursday as the destination day with an85% value.

C. Select Thursday using the calendar. Click "Mass populate" and select the next day value = previous day value * percent operation and select Friday as the destination day with an 85% value.

D. Select Thursday using the calendar. Click "Masspopulate" and select the copy day- today operation and select Friday as the destination day with an 85% value.

E. Select Friday using the calendar. Click "Mass populate" and select the copy day-to-day operate and select Thursday as the destination day withan 85% value.

Browse 132 Q&As
Questions 12

Which two Resource Type roles offer the ability for routing to assign activities?

A. Vehicle

B. Field Resource

C. Tool

D. Bucket

E. Organization Unit

Browse 132 Q&As
Questions 13

A customer wants to configure the OFSC GUI to show when a resource has not activated their route by the exact planned shift start time and send an email to theresource's supervisor.

Which two options are true regarding how this requirement is supported?

A. Configuring a message scenario using the launch condition "Route is not activated" will also enable the Alert Setting "Route has not been started x minutes after the start time of resource work day".

B. The Alert Setting "Route has not been started x minutes after the start time of resource work day" should be configured for 1 minute(s).

C. The Alert Setting "Route has not been started x minutes after the start time of resource work day" should be configured for 0 minute(s).

D. The configuration related to email notification must be performed in the Message Scenarios.

Browse 132 Q&As