Which one is a product risk associated with the air quality management system?

A. The system required to monitor oxygen levels may be more expensive than those required to monitor air temperatures.

B. SubsInc may need to recruit extra developers and testers to deliver the project on time.

C. Oxygen levels may reach dangerously low levels.

D. Extreme temperatures may lead to heat exhaustion of personnel.

Browse 25 Q&As
Questions 5

Which of the following test design techniques would be most suitable for testing that the oxygen is released at the required times?

A. Decision Testing.

B. Statement Testing.

C. Data flow Testing.

D. Boundary Value Analysis.

Browse 25 Q&As
Questions 6

When creating the functional specification for the temperature control system, which of the following review types would be most recommended to resolve any issues?

A. A walkthrough.

B. A technical review.

C. A management review.

D. A code inspection.

Browse 25 Q&As
Questions 7

Which of the following are product risks and which are project risks?

a.

The navigation through some parts of the website may need to be different from others.

b.

Sprint 1 may not be completed on time, leading to a delay to the start of Sprint 2.

c.

Text versions of images may not always be possible.

d.

There may be a need to buy a capture-replay tool for regression testing.

e.

A key member of the team may leave before the Sprints have been completed.

A.

a, b and c are product risks, d and e are project risks.

B.

a and c are products risks, b, d and e are project risks.

C.

b, c and e are product risks, a and d are project risks.

D.

a, d and e are product risks, b and c are project risks.

Browse 25 Q&As
Questions 8

Which of the following is the main purpose of an incident tracking process?

A. To identify the average number of steps required to recreate each incident.

B. To calculate the average turnaround times per defect.

C. To identify the priority of each incident.

D. To understand the status of each incident at any given time.

Browse 25 Q&As
Questions 9

Which of the following would be applicable as part of a test policy for testing these types of systems?

a.

Systems must be tested for compliance to industry standard routing protocols.

b.

Testing for the latest upgrade will require testing of increased network traffic of 100%.

c.

Testing for the fix will require the use of dynamic analysis tools.

d.

Releases will not be made if systems have any high priority defects outstanding.

A.

a and b.

B.

a and d.

C.

b and c.

D.

b and d.

Browse 25 Q&As
Questions 10

Which of the following reviews would you recommend to address this issue?

A. A walkthrough of the requirement specification, to check for errors.

B. A management review of defects logged and cleared to see if defects are being addressed correctly.

C. A technical review of the industry standard routing protocols to see if they have inaccuracies in them.

D. An inspection of the code for this part of the functionality to try to localise the defective parts of the code.

Browse 25 Q&As
Questions 11

You are convinced that delivery will be late. Which of the following reviews would be recommended at this time?

A. A management review of the test plan and results.

B. A walkthrough of the test plan and results.

C. A technical review of the user-stories.

D. An inspection of all code for the trading environment.

Browse 25 Q&As
Questions 12

Which of the following test design techniques could be used to do this?

a.

Statement testing.

b.

Path testing.

c.

State transition testing.

d.

Exploratory testing.

A.

a and c.

B.

b and c.

C.

c and d.

D.

a and d.

Browse 25 Q&As
Questions 13

Which of the following best describes the order in which this should be carried out?

a.

Decide which category of test design technique to use.

b.

Review test specifications.

c.

Write test procedures.

d.

Create test cases.

e.

Identify test conditions.

A.

a, b, d, e then c.

B.

b, e, a, d then c.

C.

b, a, d, c then e.

D.

e, b, a, d then c.

Browse 25 Q&As
Exam Code: BH0-007
Exam Name: ISEB Intermediate Certificate in Software Testing
Last Update: Apr 25, 2024
Questions: 25 Q&As

PDF

$49.99

VCE

$59.99

PDF + VCE

$67.99