Vcehome > IBM > IBM Certified Specialist > C4090-454 > C4090-454 Online Practice Questions and Answers

C4090-454 Online Practice Questions and Answers

Questions 4

A customer has an installed TS3SOO Tape Library with one L23 frame with only four TS1140 model drives. All are currently attached to open systems servers. The library and drives are being moved to another location and attached to a local

z/OS system.

Which additional hardware is essential at the new location to support four TS1140 drives?

A. 3953-F05 with 3592-007

B. 3952-F05 with 3592-007

C. 3953-F05 with L05 Library Manager

D. 3584-D23 with one Fibre Channel switch

Browse 81 Q&As
Questions 5

Which statement best describes Recovery Point Objective?

A. The maximum tolerable time it takes to restore service to all users between outage and 100% of the users back online.

B. How much data (typically measured in minutes, or seconds) the business can afford to recreate (or lose) after a disaster.

C. The maximum tolerable time to re-establish and/or restart the network between outage and the network being available again.

D. The maximum time the business can tolerate the IT systems and critical applications being unavailable, between outage and the system being available again.

Browse 81 Q&As
Questions 6

A banking customer's TS7740 was unable to replicate the tape backup data to the DR data center via the current grid network. The IBM support engineer had created a PMR with Severity 1 because the tape library is supporting the customer's production environment. Six hours after the PMR was created, IBM Level 2 support requested to change the Severity Level to 2, even though the problem had not been resolved. Based on IBM guidelines, why would this problem need to be reduced to Severity 2?

A. Severity 1 only applies to Tape Faillure

B. Severity 1 only applies to Network Failure

C. Severity 1 only applies to Production Failure

D. Severity 1 problem must be resolved within 6 hours

Browse 81 Q&As
Questions 7

A customer has a TS3500 Tape Library with TS1140 Tape Drives, but does not have the High Availability' feature. If the accessory fails, which activity must be performed to resume operations?

A. Contact IBM support

B. Re-initialize the Library Manager

C. Cycle between Pause and Auto mode

D. Perform a re-inventory of the cartridges in the library

Browse 81 Q&As
Questions 8

As viewed from the front of the library, which frame can be configured as a service bay on the right side of the TS3500 High Availability Tape Library?

A. 3584-S24 frame

B. 3584-Lx3 frame

C. 3584-SC1 frame

D. 3584-HA 1 frame

Browse 81 Q&As
Questions 9

According to the IBM TS7700 Performance white paper, why does it show that a T67720 has only a sustained I/O performance and a TS7740 has a sustained AND peak I/O performance?

A. Disk is faster than tape

B. A disk-based repository delivers more constant throughput rates

C. The TS7740 has to do pre-migration tasks at a certain point of operation

D. The TS7740 Fibre Channel disk cache does filesystem rebuilds from time to time

Browse 81 Q&As
Questions 10

A customer has installed two TS7700 Virtualization Engines in a grid configuration for disaster recovery. Cluster U is local to the production hosts, and Cluster 1 is located in the remote DR center with no host processors. They want to maximize the probability that recently written logical volumes are in the cache of Cluster 1 in case of a loss of Cluster U, while maintaining copies in both clusters. Which Copy Consistency Point settings are most appropriate to use?

A. Cluster U = RD. Cluster 1 = RD

B. Cluster U = RD. Cluster 1 = NR

C. Cluster U = DR. Cluster 1 = DR

D. Cluster U = NR, Cluster 1 = RN

Browse 81 Q&As
Questions 11

In a TS7700 R2.x system, how many logical paths are provided by the minimum FICON adapter configuration?

A. 256

B. 512

C. 1024

D. 2048

Browse 81 Q&As
Questions 12

The TS7700 Virtualization Engine can be connected to otherTS7700 clusters to form a grid. What networking protocol is used to move data between the grid members?

A. SNA

B. FC0E

C. EICON

D. TCP/IP

Browse 81 Q&As
Questions 13

A customer wants to move a set of LPAR workloads from a TS7740 four-way grid in Location A to a new TS7740 three- way grid in Location B. The move must be staged for operational reasons. The customer has successfully moved the first LPAP's workload and established the new grid in Location B. What mechanism would be required to move the remaining workloads?

A. copy export

B. grid replication

C. copy export merge

D. TDME to copy the tape volumes

Browse 81 Q&As
Exam Code: C4090-454
Exam Name: IBM High-End Tape Technical Solutions V7
Last Update: May 13, 2024
Questions: 81 Q&As

PDF

$49.99

VCE

$59.99

PDF + VCE

$67.99