Vcehome > SAP > SAP Certified Application Associate > C_TFIN22_66 > C_TFIN22_66 Online Practice Questions and Answers

C_TFIN22_66 Online Practice Questions and Answers

Questions 4

Which of the following management accounting (CO) components requires an operating concern?

A. Profit Center Accounting

B. Overhead Cost Controlling

C. Product Cost Accounting

D. Profitability Analysis

Browse 175 Q&As
Questions 5

You are creating an Fl posting in classic GL with assignment to a CO object?

A. The posting will only be posted to the original assigned CO object.

B. The posting will be assigned to the top node of the profit center standard hierarchy.

C. The posting will be assigned to the dummy profit center.

D. The posting cannot be saved.

Browse 175 Q&As
Questions 6

Scenario Profit Center Update with real time integration is activated in the New GL. How is the profit center information stored in financial postings to a CO object?

A. In a separate profit center accounting document.

B. In a separate field in the New GL document.

C. In a reconciliation ledger document.

D. In a separate New GL document.

Browse 175 Q&As
Questions 7

When settling an investment order for an unfinished asset, the customer, by law, needs to settle the order to an asset under construction (AuC).

How can this be accomplished in the system?

A. Set up an appropriate investment reason and a threshold for scale level and assign both to the order.

B. Set up an assessment cycle to allocate the costs of the investment order to the previously created AuC.

C. Assign a settlement rule to AuC directly to the position of the investment program.

D. Set up the investment profile to use the AuC of a certain asset class and assign it to the used order type.

Browse 175 Q&As
Questions 8

A customer needs an error message to be displayed when the internal order budget has been exceeded by 15%. How can the customer achieve this?(Choose two)

A. By entering the budget profile in the order type.

B. By customizing the tolerance limits for the budget profile.

C. By activating availability control in the controlling area.

D. By entering the budget profile in the order master data.

Browse 175 Q&As
Questions 9

A customer allocates a variety of cost elements from many cost centers to others by distribution cycles. The customer complains about the long duration and runtime. What do you recommend to shorten the runtime?(Choose two)

A. Use cycle run groups for parallel processing.

B. Use iteration within the cycles.

C. Use assessment instead of distribution.

D. Use an allocation structure within the distribution cycles.

Browse 175 Q&As
Questions 10

Which information is transferred when you settle an Internal Order to costing-based CO- PA?

A. Cost component split of the order cost.

B. Characteristic values of the settlement rule.

C. Variance categories of the internal order.

D. All information of the internal order master data.

Browse 175 Q&As
Questions 11

The system does not allow you to create a primary cost element.

What do you check first?

A. Whether the P/L account exists

B. Whether the cost element category is valid

C. Whether the balance sheet account exists

D. Whether the 6/L account currency is the same as the controlling area currency

Browse 175 Q&As
Questions 12

Where do you determine the price finding strategy for material costing?

A. Valuation variant

B. Price control

C. Price determination

D. Valuation class

Browse 175 Q&As
Questions 13

Which of the following SAP Life-Cycle Data Management functions provides the integration of external files into SAP ERP?

A. Variant Configuration Management

B. Engineering Change Management

C. Document Management

D. Product Structure Browser

Browse 175 Q&As
Exam Code: C_TFIN22_66
Exam Name: SAP Certified Application Associate - Management Accounting (CO) with SAP ERP 6.0 EHP6
Last Update:
Questions: 175 Q&As

PDF

$49.99

VCE

$59.99

PDF + VCE

$67.99