The vCenter database is powered off ungracefully, along with a three cluster nodes in a separate cluster. Will the failed existing ESXi host nodes restart correctly using Auto Deploy?
A. Yes
B. No
You are working as a platform designer for a large hosting provider. You are considering the scalability of a solution that is projected as 50 hosts and 1,500 virtual machines. A VCSA is a project requirement. Which of the following is true?
A. The VCSA will scale to 5 hosts and 50 VMs and thus is a risk to project scalability.
B. The VCSA can be configured to use a remote SQL database to meet project scalability.
C. The VCSA should be configured to use a remote DB2 or Oracle database.
A guest VM has a 24 GB allocated to it and a 13 GB limit. What is the size of the swap file?
A. 24 GB minus the reservation
B. 8 GB
C. 24 Gb plus the Reservation
During an upgrade of VMware vSphere 4.1 to vSphere 5.0, several virtual machines appeared to have lost network configuration. What is the possible cause of the issue?
A. DHCP server not available
B. Incorrect order of upgrade implementation steps
C. Incorrect drivers.
You are a VMware architect working at a company where a business application is being rolled out. Based on conversations with the business, you establish that the RTO requirement is 2 hours, and the RPO requirement is 3 hours. Consider a situation in which the VMware platform is out of service following multiple hardware issues. The application dropped from service at 2 p.m. To meet the application business SLA, which of the following is true?
A. When the application is brought online, the data must be from a version as of 4 p.m.
B. When the application is brought online, the data must be from a version as of 11 a.m.
Which of the following is a logical boundary for vMotion?
A. Cluster
B. vDC
C. Folder
D. Resource Pool
You have been asked to design a system with the following VMware functionality enabled:
R001: VMware HA must be functional.
R002: VMware SRM can be used between two sites for DR processes. R003: You must be able to see all hosts from a single pane of glass.
From these requirements:
A. A vSphere 5.0 VCSA can provide an acceptable solution.
B. A vSphere 5.0 Windows-based vCenter can provide an acceptable solution.
C. The requirements cannot be met.
The infrastructure qualities of a good design are availability, manageability, performance, recoverability, and security.
A. True
B. False
A functional requirement in a design requires management, IP-based storage, vMotion, and virtual machine traffic to be physically separated. Which option best fulfills the functional requirement?
A. Using a single virtual switch, applying VLANS for each traffic type, and configuring the physical adapters to use different physical switches
B. Using distributed virtual switches
C. Using a different virtual switch for each type of traffic and having all network adapters use the same physical switch
D. Using a different virtual switch for each type of traffic and having the physical adapters use different physical switches
You are a VMware architect attending a project kickoff meeting. The project vision is to "consolidate all existing physical workloads to a vSphere 5 platform." The high-level requirements are defined during the design kickoff meeting. Which of the following is true?
A. You should make design choices based on current best practices and case studies from previous vendor implementations.
B. You should review the current server estate to ensure the viability of the project in relation to the requirements and establish the tasks required to achieve the vision.
C. You should construct a logical and physical design, based on requirements and guide best practices from previous implementations in the community.