Vcehome > VMware > VMWare Data Center Virtualization vSphere 5 > VCP5-DCV > VCP5-DCV Online Practice Questions and Answers

VCP5-DCV Online Practice Questions and Answers

Questions 4

Click the Exhibit button.

An administrator has implemented a new vSphere 5 environment and is deploying their first Windows 2008 R2 template. When running the Deploy Template wizard, the error shown in the exhibit appears. What can be done to correct the problem?

A. Select the correct guest OS setting for the virtual machine.

B. Windows 2003 x64 cannot be customized.

C. Download and install the Microsoft Sysprep tool into the virtual machine to be customized.

D. Download the Microsoft Sysprep tool to the appropriate vCenter Server directory.

Browse 571 Q&As
Questions 5

Which settings are required for virtual machine guest tagging for VLAN 100 in a vSphere 5.x environment?

A. Port Group configured for VLAN 100, physical switch configured as a VLAN trunk

B. Port Group configured for VLAN 4095, physical switch configured as a VLAN trunk

C. Port Group configured for VLAN 100, physical switch configured for VLAN 100

D. Port Group configured for VLAN 4095, physical switch configured for VLAN 100

Browse 571 Q&As
Questions 6

Click the Exhibit button.

ACME Catering Services is using esxtop to troubleshoot a performance problem with one of their ESXi 5.x hosts. Host disconnections from vCenter Server as well as sluggish performance when performing tasks on the host have been observed. Based on the output in the exhibit, how many vCPU's have been assigned to FileServer01?

A. 1

B. 2

C. 4

D. 8

Browse 571 Q&As
Questions 7

An administrator is updating a program running on a virtual machine. The update file has been downloaded as an .iso file and placed on a shared NFS datastore. An attempt to mount the .iso file to the virtual machine fails, but subsequent testing shows that the .iso file can be mounted to a virtual machine running on another ESXi 5.x host.

Which step can be taken to enable access to the .iso file for the affected virtual machine?

A. Reboot all ESXi hosts in the cluster where the affected virtual machine is running.

B. Refresh all datastores on the ESXi host running the affected VM.

C. Rescan all datastores on the ESXi host running the affected VM.

D. Unmount the volume from the ESXi host running the affected VM, and then add as a new datastore.

Browse 571 Q&As
Questions 8

Which memory conservation technique collaborates with the server to reclaim pages that are redundant in a virtual machine or virtual machines?

A. Memory Balloon Driver

B. Transparent Page Sharing

C. Redundant Memory Driver

D. VMkernel Swap

Browse 571 Q&As
Questions 9

Which two vSphere features can be used with virtual machines that are enabled for VMware Fault Tolerance? (Choose two.)

A. EVC

B. Storage vMotion

C. RDMs in virtual compatibility mode

D. VMware Virtual SMP

Browse 571 Q&As
Questions 10

A vSphere administrator can create an alarm on which two objects? (Choose two.)

A. LUN

B. Datastore

C. Template

D. Folder

Browse 571 Q&As
Questions 11

What action should an administrator take to store ESXi 5.x host system logs centrally?

A. Configure vCenter Server to automatically export log files to a syslog server at regular intervals.

B. Configure vCenter Server to send all log information to a syslog server.

C. Configure each ESXi host to send all log information to a syslog server.

D. Configure the syslog server to import log files from each ESXi host at regular intervals.

Browse 571 Q&As
Questions 12

Which privilege should the administrator assign to allow a user to create baselines using Update Manager?

A. Manage baseline

B. Attach baseline

C. Stage baseline

D. Configure baseline

Browse 571 Q&As
Questions 13

-- Exhibit -

-- Exhibit -An administrator receives notice of a large number of ARP table issues. The issues began after a maintenance window 36 hours ago. The issue did not exist prior to the maintenance window.

Which change was made to the port group that is causing the ARP table issue?

A. Notify Switches was changed to No.

B. Uplink 2 was changed from Standby to Active.

C. Failback was changed to Yes.

D. Network failure detection was changed to Link status only.

Browse 571 Q&As
Exam Code: VCP5-DCV
Exam Name: VMware Certified Professional 5 – Data Center Virtualization (VCP5-DCV) Exam
Last Update: Apr 25, 2024
Questions: 571 Q&As

PDF

$49.99

VCE

$59.99

PDF + VCE

$67.99