Vcehome > IBM > IBM Certified Deployment Professional > C2010-555 > C2010-555 Online Practice Questions and Answers

C2010-555 Online Practice Questions and Answers

Questions 4

An administrator has a requirement to create 44 new assets that each share a common configuration. Which application can do this with a single action?

A. Assets

B. Item Master

C. Classifications

D. Asset Templates

Browse 144 Q&As
Questions 5

A maintenance planner is in the process of planning time sensitive emergency maintenance work orders for a number of assets where items need to be reserved.

What reservation type should be used?

A. Soft

B. Hard

C. Urgent

D. Critical

Browse 144 Q&As
Questions 6

What is the reason to specify asset relationships?

A. To deploy assets.

B. To design the asset infrastructure.

C. To define a logical connection between separate assets.

D. To define how assets are allowed to behave when work is performed on them.

Browse 144 Q&As
Questions 7

A company is using Process Flow Control and wants to change the default values for Flow Start and Flow Complete statuses.

Where can these values be configured?

A. System Properties

B. Work Type settings

C. WOSTATUS Domain

D. Change Work Order Options action

Browse 144 Q&As
Questions 8

A rotating asset has been inspected and approved. The asset is then found to be faulty and needs to be returned to the vendor.

What will happen to the asset after it has been returned? (Choose two.)

A. Asset status will change to DECOMMISSIONED.

B. Asset record will be deleted after it has been returned.

C. Returned to Vendor checkbox has been selected and made read-only.

D. Asset status will change to INACTIVE when there is no inventory balance.

E. Asset will be changed to a non-rotating asset and no longer reside in the storeroom.

Browse 144 Q&As
Questions 9

Cutover work from cooling to heating is performed on the air handling units during the month of October each year. A requirement is to have the PM record generate Work Orders every Sunday during October.

What settings are necessary?

A. Frequency = 1, Frequency Units = MONTHS, and Active Dates values entered on the Seasonal Dates tab

B. Frequency = 7, Frequency Units = DAYS, and Active Days and Dates values entered on the Seasonal Dates tab

C. Frequency = 7, Frequency Units = DAYS, and Generate Work Order When Meter Frequency is Reached checked

D. Frequency = 1, Frequency Units = WEEKS, and Use Last Work Order's Start Date to Calculate Next Due Date checked

Browse 144 Q&As
Questions 10

If the status of an item record is modified in the Item Master application, which two other records need to be updated in order for the item to be purchase and stocked? (Choose two.)

A. the item's Company status

B. the item's Organizational status

C. the status of the item for the Set

D. the status of the item for the Site

E. the status of the item in inventory

Browse 144 Q&As
Questions 11

A forecast for a monthly PM has been generated for 6 minutes. A new data has been entered for the second row and saved. When the Process Pending Reforecast button is clicked, the following error appears: BMXAT0217E-There is no reforecast pending to process.

What would cause this error?

A. The reforecast dates are locked

B. The PM is not in the Active status

C. The reforecast cron task is set to run every 3 days

D. The Reforecast Subsequent Dates? checkbox was not checked before the forecast was generated.

Browse 144 Q&As
Questions 12

A planner has developed an ad hoc report with information specific to a variety of locations and assets.

The planner wants to automatically run and receive this report every Monday at 7am as well as having it

sent to a maintenance supervisor.

What reporting feature enables this?

A. Escalation

B. No Request Page

C. Maximo Scheduler

D. Scheduling and Emailing

Browse 144 Q&As
Questions 13

An asset requires a diagnostic evaluation every 3 months and an oil change every 18 months. It has been decided to use Job Plan sequencing to generate the work orders at the appropriate interval where Job Plan A represents the 3-month diagnostic and Job Plan B represents the 18-month oil change.

What are the Job Plan sequence values to accomplish this?

A. Job Plan A=1 and Job Plan B=6

B. Job Plan A=3 and Job Plan B=6

C. Job Plan A=1 and Job Plan B=18

D. Job Plan A=3 and Job Plan B=18

Browse 144 Q&As
Exam Code: C2010-555
Exam Name: IBM Maximo Asset Management v7.6 Functional Analyst
Last Update: Apr 30, 2024
Questions: 144 Q&As

PDF

$49.99

VCE

$59.99

PDF + VCE

$67.99