Vcehome > IBM > IBM Solution Designer > C9510-058 > C9510-058 Online Practice Questions and Answers

C9510-058 Online Practice Questions and Answers

Questions 4

What are three key elements of a workload? (Choose three.)

A. user attributes (types and characteristics)

B. transaction mix and frequency

C. test script creation

D. data security

E. test environment and configuration

Browse 60 Q&As
Questions 5

A company wants to see if their website can be operated under load for a longer duration of time. Which type of test is suitable for this requirement?

A. stress test

B. volume test

C. contention test

D. endurance test

Browse 60 Q&As
Questions 6

What happens to all the page elements in a test?

A. They are grouped by page unless the application under test uses AJAX.

B. They are grouped by page as a visual aid to enhance readability.

C. They are assigned dynamically to separate virtual testers at playback time.

D. They use separate records from a single datapool.

Browse 60 Q&As
Questions 7

What is the easiest way that a current timestamp in a page request can be generated?

A. by writing a custom code method that invokes java.util.Date

B. by writing a custom code method that invokes java.util.Timer

C. by correlating the timestamp value to a built-in datasource

D. by using the NOW() Excel function in a column of a datapool

Browse 60 Q&As
Questions 8

How do you pass parameters to custom code?

A. select references or data to pass as arguments in the Test Details editor pane

B. select references for input as arguments

C. enter strings to pass as arguments

D. select datapool elements to pass as arguments

Browse 60 Q&As
Questions 9

Which feature is available to help you trace pages and page elements through a test?

A. Pages are linked to page elements in the page element data section.

B. The protocol data view provides request, response, and a browser view of the data.

C. The page names correlate with the test activity.

D. Chunked data views are available.

Browse 60 Q&As
Questions 10

What is the purpose of enhancing schedules?

A. to increase the performance of the test

B. to emulate workload analysis as closely as possible

C. to create a group of tests to run

D. to determine the best time to run a test

Browse 60 Q&As
Questions 11

Workload analysis is a design-time activity that includes which four processes? (Choose four.)

A. identifying the performance bottlenecks of the application

B. identifying the workload to be simulated or emulated in the performance tests, in terms of number of actors or actor classes and actor profiles

C. identifying the actors and actor characteristics to be simulated or emulated in the performance tests

D. clarifying the objectives of performance testing and the use cases

E. determining the performance measures and criteria

F. identifying the quality of application architecture

Browse 60 Q&As
Questions 12

Where can you observe verification point results?

A. The Verification Point report will provide details of the Verification points over the duration of the test.

B. The HTTP performance report has a bar chart for Verification Point results on the overall tab.

C. The test log presents detailed Verification Point results.

D. All of the above

Browse 60 Q&As
Questions 13

What is the term for accurately defining the loading conditions under which the target test items must operate within their target configuration environment?

A. test scheduling

B. hardware sizing

C. workload analysis

D. threat modeling

Browse 60 Q&As
Exam Code: C9510-058
Exam Name: Rational Performance Tester V8
Last Update: May 11, 2024
Questions: 60 Q&As

PDF

$49.99

VCE

$59.99

PDF + VCE

$67.99