What are three ways builds are scheduled and initiated? (Choose three.)
A. at a continuous interval in minutes on selected days
B. at a particular time for defined days
C. by a user with appropriate permissions
D. automatically after a user saves a change
E. By adding the keyword "@build" in a work item comment
What is the repository workspace?
A. a server-side entity that tracks items that have been placed under source control
B. a local workspace that holds a copy of specific sets of file versions that are stored in Rational Team Concert
C. the Eclipse workspace used when Rational Team Concert is launched by using the Eclipse client
D. the local copy of the latest file versions on a Rational Team Concert stream
What is associated with a project area and is a collection of practices, rules, and guidelines?
A. process
B. Team area
C. work item
D. rule set
Which basic report output styles are produced by the reporting capabilities available with Rational Team Concert?
A. tables, models, and icons
B. diagrams, sketches, and free-form text
C. graphs, charts, and documents
D. boiler-plates, pivot tables, and references
What is a function of a snapshot?
A. to create a picture file of a specific work item in an iteration plan
B. to capture the state of all the components in a stream or workspace
C. to lock a set of files in a repository workspace and provide isolation
D. to track the flow targets for a repository workspace to another workspace
What are two purposes of work item categories? (Choose two.)
A. to determine which team member owns the work item
B. to determine which team owns the work item
C. to classify a work item according to functional area or team
D. to define the priority and the completion date of the work item
Which format is used to download the results of a work item query in the web client?
A. .docx
B. .html
C. .pdf
D. .csv
E. .odp
Which three Rational Team Concert user interfaces allow users to request and view build results? (Choose three.)
A. Eclipse client
B. Visual Studio client
C. web client
D. command line
E. Customer Information Control System
Which statement is true about the structure of a project area?
A. A project area may contain a team area
B. A project area can contain only one timeline
C. A project area is contained in a team area
D. A project area is included in a timeline
At which three levels can permissions be assigned to an individual role? (Choose three.)
A. work item
B. team area
C. project area
D. iterations
E. server