Vcehome > EMC > EMC Other Certification > DES-6321 > DES-6321 Online Practice Questions and Answers

DES-6321 Online Practice Questions and Answers

Questions 4

DRAG DROP

Match the management tool that is used to perform the associated operation in a VxRail environment.

Select and Place:

Browse 196 Q&As
Questions 5

What is a consideration for using link aggregation on the Top of Rack (ToR) switch for a VxRail?

A. Should not be used for VxRail node ports, but can be used for uplink and ISL

B. Is not supported on the VxRail ToR switch

C. Can be configured for any connectivity, but are not required

D. Should always be configured for VxRail node ports to allow for failover

Browse 196 Q&As
Questions 6

View the Exhibit.

You are reviewing a VxRail Pre-Installation Site Checklist.

What conclusion can be drawn about the VxRail deployment from the exhibit?

A. Top of Rack (ToR) switches will use two uplink ports

B. Upstream switches will have two ISLs

C. Two Top of Rack (ToR) switches will be used

D. Two Upstream switches will be used

Browse 196 Q&As
Questions 7

What accurately describes the positioning of a VxRail?

A. Can start small and grow with a low entry cost

B. Software defined solution with rack scale and integrated networking

C. Can start small and grow to hundreds of nodes

D. Converged architecture with enterprise grade resiliency

Browse 196 Q&As
Questions 8

What is a characteristic of vSAN Erasure Coding?

A. Used for Garbage Collectionon all-flash VxRail clusters

B. Is a DoD certified individual drive cleaning tool to facilitate drive replacement

C. Used to securely erase vSAN storage to facilitate node replacement

D. Is a Raid 5/6-like storage policy

Browse 196 Q&As
Questions 9

How does the Network Validation Tool (NVT) validate Top of Rack (ToR) switch configurations?

A. NVT requires switch logon information and parses through the running-config of the switch

B. Using the switch grab batch file, the output is imported into the NVT User Interface

C. The running-config is imported into the NVT User Interface

D. Top of Rack switches are always manually validated prior to implementation

Browse 196 Q&As
Questions 10

When populating the VxRail First Run Wizard for an External vCenter solution what is the recommended format for hostnames?

A. vCenter, PSC, and VxRail Manager use host name only

B. vCenter and PSC use FQDN; VxRail Manager uses host name onl

C. VxRail Manager and vCenter use FQDN; PSC uses host name only

D. vCenter. PSC, and VxRail Manager use FQDN

Browse 196 Q&As
Questions 11

requirement must be met when expanding a VxRail G560F 3 node Cluster with a 4ih G Series node in the same chassis?

A. Node must be identical to the other three nodes

B. Node requires only the same drive configuration

C. Node must be a hybrid node

D. Node requires only the same processor type

Browse 196 Q&As
Questions 12

You are configuring SmartFabric Services on a VxRail running version 4.7X. What is the maximum number of separate vCenter instances that an OMNI plug-in can be registered with in a single fabric?

A. 1

B. 2

C. 5

D. 10

Browse 196 Q&As
Questions 13

What is the minimum number of VxRail nodes required for a vSAN storage policy with FTT = 2 an6 FTM set to Erasure Coding?

A. 4

B. 5

C. 6

D. 7

Browse 196 Q&As
Exam Code: DES-6321
Exam Name: Specialist - Implementation Engineer - VxRail Appliance Exam
Last Update:
Questions: 196 Q&As

PDF

$49.99

VCE

$59.99

PDF + VCE

$67.99