DRAG DROP

Use the arrow or click and drag the steps on the left to set up a new HPE Synergy 12000 Frame into the correct order on the right.

Select and Place:

Browse 53 Q&As
Questions 5

How can a Synergy integrator increase the efficiency with which a Synergy solution can be provisioned? (Choose two.)

A. Use Powershell to automate configuration and application of server profiles.

B. Use Image Streamer to provide a stateless OS environment.

C. Associate all Synergy frames with the same data center.

D. Use a Multimodule Link Aggregation Group (MLAG) to automate link failover.

E. Use Composer as a PXE server to automate OS deployments.

Browse 53 Q&As
Questions 6

A customer needs to attach 20 HPE 1TB 6G SAS SFF hard drives to an HPE Synergy 480 Gen9 compute module. The customer needs a fully redundant storage solution.

Which HPE products meet the customer's needs? (Choose three.)

A. HPE D3940 storage module with HPE Synergy D3940 Redundant I/O Adapter.

B. HPE D3940 storage module with Single I/O Adapter.

C. two HPE Synergy 12Gb SAS Connection Modules

D. two HPE Smart Array P542D Controllers

E. one HPE Smart Array P542D Controller

F. one HPE Synergy 12Gb SAS Connection Module

Browse 53 Q&As
Questions 7

While troubleshooting a hardware issue, a Synergy integrator needs to provide HPE Support with a new support dump. What must the integrator be aware of when generating a support dump?

A. When creating a new support dump, the previous support dump is deleted.

B. Only two support dumps can exist on an appliance at any one time.

C. Root level privileges are required to create a support dump.

D. Management tasks are suspended during support dump creation.

Browse 53 Q&As
Questions 8

A Synergy integrator is creating a network that must be connected from the HPE Synergy Virtual Connect SE 40Gb F8 module to an Ethernet switch carrying 500 VLANs for the hypervisor cluster. Which network should the Synergy integrator select during network creation?

A. Ethernet Tunneled

B. Ethernet Channeled

C. Ethernet Tagged

D. Ethernet Untagged

Browse 53 Q&As
Questions 9

A customer has moved a USB bootable drive to another compute module but the compute module fails to boot from the USB device.

What should the Synergy integrator do to resolve this issue?

A. In the server Profile, make sure OS Deployment is set to Deployment Plan.

B. Use UEFI System Utilities to disable the B140i RAID controller.

C. Verify that the USB drive key is enabled in UEFI System Utilities.

D. Make sure PXE boot is disabled.

Browse 53 Q&As
Questions 10

A Synergy integrator is working with a customer to perform a first-time setup of a 3-frame Synergy environment. The following fabric modules are installed: Frame 1

Bay 1

Browse 53 Q&As
Questions 11

A customer is unable to boot to a 3.5TB volume created and presented to a compute node.

What is likely preventing the boot?

A. Boot volumes larger than 3TB are not supported on HPE Synergy.

B. The system is set to Legacy BIOS mode instead of UEFI.

C. The system is set to UEFI instead of Legacy BIOS mode.

D. Boot volumes larger than 2.2TB are not supported on Synergy.

Browse 53 Q&As
Questions 12

Using a laptop, how can the Synergy integrator perform the initial setup on an HPE Synergy 12000 Frame?

A. Connect a CAT5 cable to the front panel module, use the HPE Synergy default IP address of 192.168.10.31, port 5900, and connect to the HPE Synergy console with VNC.

B. Connect a CAT5 cable to the MGMT port of the top Frame Link Module and connect to the HPE Synergy console with VNC to the address 248.196 port 5900.

C. Connect a CAT5 cable to the front panel module, use the HPE Synergy default IP address of 192.168.10.1, port 5900, and connect to the HPE Synergy console with a web browser.

D. Connect a CAT5 cable to the MGMT port of the top Frame Link Module and connect to the HPE Synergy console with a web browser to the address 192.168.10.1, port 5900.

Browse 53 Q&As
Questions 13

A customer is planning an HPE Synergy solution with 20 frames and needs to minimize the number of management ports that are required to connect the frames into the existing management network.

Which procedure should the Synergy integrator use to address the customer's concern?

A. Connect FLMs from all frames into a management ring. Then connect the management ring to the customer's management network using two uplinks.

B. Connect FLMs from all frames to two external switches for redundancy. Then connect the two uplinks from the two switches into the customer's management network.

C. Connect the RJ-45 front ports of each frame to two external switches for redundancy. Then connect the uplink from the two switches into the customer's management network.

D. Connect the RJ-45 front ports of each frame to an external switch. Then connect the uplink from the external switch into the customer's management network.

Browse 53 Q&As
Exam Code: HPE0-S50
Exam Name: Integrating HPE Synergy Solutions
Last Update: May 08, 2024
Questions: 53 Q&As

PDF

$49.99

VCE

$59.99

PDF + VCE

$67.99