A company produces multiple products that require an installation kit that includes 50 components.

The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not want it to produce a separate production order.

You need to set up the product BOM for the finished good.

What should you do?

A. Select Phantom on the engineering fast tab on the kit item

B. Change the coverage group on the kit item to Manual

C. Change the line type to Phantom

D. Change the line type to Pegged supply

Browse 230 Q&As
Questions 5

A company sells large batches of chemicals. Item specifications vary from batch to batch.

You must fulfill multiple orders from the same batch of chemicals. If a single batch cannot be reserved, manual reservation must be used. The system must also make reservations based on the earliest batch receipt date.

You need to set up a new chemical item that automatically uses the new batch reservation logic.

Which three settings should you configure? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A. In the Tracking dimension group, select Coverage plan by dimension for batch number

B. In the Item model group, select FEFO date-controlled

C. In the Item model group, select the FIFO inventory model

D. In the Item model group, select Same batch reservation and Consolidate requirements

E. In the storage dimension group, select Coverage plan by dimension for the site and warehouse dimensions

Browse 230 Q&As
Questions 6

A manufacturing company uses master planning in Dynamics 365 Supply Chain Management.

Purchase orders for a raw material are created more frequently than needed. This results in missed discounts with the vendor who sells the raw material.

The raw material items have a 30-day lead time. The company is willing to delay sales and production order demand that may consume the raw material for up to 15 days to consolidate purchase orders.

You need to configure the setup to include lead time and consolidate purchase orders.

What should you configure?

A. positive days

B. dynamic negative days and negative days

C. negative days only

D. dynamic negative days only

Browse 230 Q&As
Questions 7

You need to meet the requirements for User1. What should you configure?

A. Tracking control center

B. Load planning workbench

C. Transfer journals

D. Transfer orders

Browse 230 Q&As
Questions 8

You need to report newly manufactured bicycles as finished products.

Which three options can you use? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

A. Route card journal

B. Job card journal

C. Standard production order update

D. Report as finished journal

E. Handheld warehouse device

Browse 230 Q&As
Questions 9

You need to create the constraint for the ML seat selection.

Which expression constraint should you use?

Case Study Title (Case Study):General information

A manufacturing company produces custom configured-to-order motorcycles. The company plans to implement Dynamics 365 Supply Chain Management. The company contains one legal entity located in Missouri where all production and warehousing operations occur.

Customization options

The custom motorcycles have a variety of selections that can be selected in the listed order by the end customer, including the following:

Customization restrictions

The following restrictions on customizations are in place:

*

Green color can only be sold with the Legend Trim.

*

Orange color can be sold with the Sport or Legend Trim.

*

The ML seat must be included in the Legend package.

*

The MS seat must be included in the Sport package.

Manufacturing facilities

The company includes the following manufacturing groups: Assembly and Plastic Molding. The Assembly group is responsible for assembling the motorcycles with purchased and manufactured goods. The Plastic Molding group is responsible for manufacture of all plastic parts used in the assembly area.

Motorcycle manufacturing

The parts for the product assembly are picked from the warehouse and staged at the correct workstation by a warehouse operator for each production order.

Plastic manufacturing

Plastic parts are molded using dyes that create multiple parts at once. The parts are machined in the same production process to remove excess plastic and add additional holes for assembly. Excess plastic is recycled back into the feedstock of the same color plastic chips for use in the molding process.

Metal Parts

Raw metal parts are purchased fully machined but without primer or paint. The parts are subcontracted to a vendor for primer and paint based upon the color requirements.

Facility

The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal

stations throughout the assembly production line.

Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.

Requirements

The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal

stations throughout the assembly production line.

Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.

Sales Order

The company has the following requirements for sales orders:

*

During the configuration of a sales order, invalid combinations must be prevented.

*

Each configuration must create a unique bill of material (BOM) and Route based on options selected.

*

Sales pricing for the sales order must be based upon options selected.

*

Due to emissions regulations, the motorcycles cannot be sold to the state of California.

Motorcycle manufacturing

The company has the following requirements for motorcycle manufacturing:

*

Schedule labor only at the labor pool level without machines by day

*

Produce motorcycles within a scheduled day in any order.

*

Record actual production labor with start/stop times.

*

Record manager approval of labor entered prior to posting.

*

Post actual material consumption after production is finished.

Plastic manufacture

The company has the following requirements for motorcycle manufacturing:

*

Schedule both labor and machines.

*

Adjust schedules by using a Gantt chart.

*

Backflush standard labor by operation.

*

Post actual material consumption at the start of production.

*

Track and allocate costs to the excess plastic.

*

Report multiple molded part numbers during the same production run.

*

Determine the correct mold to use on a production order.

*

Generate a batch number for each production order.

Metal Parts

The company has the following requirements for metal parts manufacturing:

*

Schedule shipments to the vendor for painting.

*

Receive painted parts into inventory from the vendor.

*

Track vendor inventory levels.

Default You must configure defaults for manufacturing execution production orders to meet the followingrequirements:

*

Ensure accuracy for production order pick list posting.

*

Ensure correct pick list creation.

Issues

A. In the current system, the company cannot calculate overhead rates and determine the breakdown of material, labor, machine, and overhead costs for production.

B. The company is manually calculating an 8% overhead on materials and posting a journal manually.

A. Implies[Trim==Legend,Seat==ML]

B. Seat!=ML

C. [Trim==Legend|Seat==ML]

D. Implies[Seat==ML,Trim==Legend]

Browse 230 Q&As
Questions 10

SIMULATION

You are a functional consultant for Contoso Entertainment System USA.

You need to configure the system to ensure that the production release to warehouse process either performed manually or via batch.

To complete this task, sign in to Dynamics 365 portal.

Browse 230 Q&As
Questions 11

A manufacturer uses route operations and job scheduling.

You use a unique calendar for a conveyor line. The company observes a decrease in the number of hours a conveyor line resource is operational due to breakdowns. You must make a temporary change to the number of hours the resource

is available.

You need to adjust the efficiency percentage for the conveyor line calendar.

Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Select and Place:

Browse 230 Q&As
Questions 12

You are the product manager at a distribution company. You are responsible for managing product compliance standards and reporting.

Chemical product, C00D1 can be sold in all parts of the United States except for the state of California.

You need to set up these compliance requirements for C0001.

Which four actions should be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Select and Place:

Browse 230 Q&As
Questions 13

HOTSPOT

You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Hot Area:

Browse 230 Q&As
Exam Code: MB-320
Exam Name: Microsoft Dynamics 365 Supply Chain Management, Manufacturing
Last Update:
Questions: 230 Q&As

PDF

$49.99

VCE

$59.99

PDF + VCE

$67.99